Sök:

Sökresultat:

2483 Uppsatser om Build and construction - Sida 1 av 166

Nyanlända elever i fritidshem : En kvalitativ intervju om fritidspedagogers arbete med inkludering

The purpose of this study was to examine how pre-school teachers in Montessori inspired and traditional preschools can work with Build and construction with the older children, and what views the pre-school teachers might have on the subject.  The study was implemented through qualitative semi-structured interviews with pre-school teachers. The investigational method was chosen due to the fact that I wanted to gain knowledge about the pre-school teachers? views and perspectives on Build and construction activities, and how they might work with it. Another reason was to examine how the view on, and the work with Build and construction can resemble and differ between Montessori inspired pre-schools and traditional pre-schools.The result shows that there is both similarities and diverseness between the Montessori influenced pre-schools and the traditional pre-schools, when it comes to how the pre-school teachers reason and work with Build and construction.

Bygg och konstruktion med de äldre barnen i förskolan : En studie om pedagogers arbete och syn kring bygg och konstruktion i traditionell förskola och montessoriförskola

The purpose of this study was to examine how pre-school teachers in Montessori inspired and traditional preschools can work with Build and construction with the older children, and what views the pre-school teachers might have on the subject.  The study was implemented through qualitative semi-structured interviews with pre-school teachers. The investigational method was chosen due to the fact that I wanted to gain knowledge about the pre-school teachers? views and perspectives on Build and construction activities, and how they might work with it. Another reason was to examine how the view on, and the work with Build and construction can resemble and differ between Montessori inspired pre-schools and traditional pre-schools.The result shows that there is both similarities and diverseness between the Montessori influenced pre-schools and the traditional pre-schools, when it comes to how the pre-school teachers reason and work with Build and construction.

Inneluftsventileradekryprumsgrunder : en utvärdering av två tillverkare

This Diploma work investigates internal air ventilated crawl-space in respect to construction and damp. The Diploma work assumes from a general description of crawl-space and general dump problems in ground construction. An internal air ventilated crawl-space is a construction where you take the ventilation air from the building and bring it down to the crawl-space and lets the air circulate before it passes through a retaining aggregate on the way out from the crawl-space. In this matter you get a worm space under the building and a lot less dump problems in form of · Ground damp · Build damp The ground dump reduces through draining around the building, different layer of gravel between the ground and the building and ventilation of the crawl- space. The build dump reduces through ventilation of the crawl-space as fast as possible.

"Jag ska också göra chokladbollar" : En undersökning om hur tillgången till konstruktionsmaterial påverkar barn i förskolan

The aim of this study was to investigate and compare the availability of construction materials affect children's constructions and play. Observations were made when the children were allowed to play and build with very little and much of the material play-doh dough in preschool. The study is aimed at children aged 3 ? 5 years. Interviews were also conducted with educators in departments where the children spent time to give support to this study.The result shows that the children create as many designs of any material amount.

Vädrets påverkan på byggarbetsplatsen

This exam report contains studies about how the weather affects the construction site from a planning and productivity perspective. In 1960?s the contractors started to build during the winter, since then the demands to obtain a good construction has been higher on both the contractor and then promoter.In this report you will see how the different actors at the construction site handle the weather problems. By several interviews of the actors at the construction site there have been opinions about the weather situation which has been collected. To get a wide perspective of the problem, field studies from four different construction sites been made.Weather statistics over Halmstad is a mayor part of this report.

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Partnering på Carlstad Conference Center : En jämförelse åt Byggbolaget i Värmland AB

Partnering is a new and exciting way of cooperation in the Swedish construction industry. In countries like Denmark and the United Kingdom the concept has been developed during a number of years while the Swedish construction industry has been more reluctant.Partnering is seen by many as the solution to the problems that often occur in design and build contracts. Many others believe that it is a way for the big entrepreneurs to gain unfair advantage. Never the less the concept is fast getting more and more appreciation, especially in the region of Karlstad where many new buildings are built that way.We have focused on the new development of Carlstad Conference Center (CCC) which is currently built with a partnering concept. The main method that have been used in this thesis are interviews with personnel on different positions in the project.

Samverkan mellan totalentreprenör och projektör i stora byggprojekt

As a result of the so called ?Million Program? between the years 1965 ? 1975 the design-build contract had its breakthrough in Sweden. Since then, the contract form has become increasingly common and now holds a strong position on the Swedish market. In design-build contracts it?s usual that the design and production time is overlapping.

Trapphus i träplattform för CBBT

Industrialization of construction is by some considered to be a solution to the building industry's problems about the lack of quality, high production costs, low productivity and poor environmental adaptation. Meanwhile, industrialized construction partly earned a bad reputation after the million housing program. As large-scale projects where promoted during this period, it worked very well to use the technique of construction elements. In the mid seventies though, criticism arose which claimed that the aesthetic qualities had been deprived in the corporates effort to make housing production as efficient as possible.Tyréns, Derome and CBBT (centre for building and housing in wood) cooperates in a development project to develop a building system for 4-8-storey buildings, consisting of three platforms: a technology platform, an IT platform and a processing platform. The technology platform consists of flexible, industrially built flat modules of wood and from this platform the subsystem stairwells, is broken out.

BIM Building Information Model : Hinder & Drivkraft

The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.

Vad är verklig kostnad per koplats? :

Purpose There are almost infinite numbers of ways to build dairy farms in Sweden. When building a new free stall barn you have the possibility to affect both working environment and animal welfare for many years to come. The construction costs are influenced by which type of barn that is built and what functions it contains, for example one can predict that automatic milking systems are more expensive to integrate than milking parlours. But what is the real cost of today for the construction of free stall barns with milking centres and how is it affected by construction methods and functions? Is the labour time influenced by the building costs? These are some of the questions this report will try to answer.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Handledning vid framtagande av handlingar för Generalentreprenad

This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..

EU:s tjänstedirektiv - ursprungsprincipen eller destinationsprincipen?

The Vaxholm conflict was initiated when the Swedish Trade Union for Construction Workers shut down a construction site in order to prevent a Latvian construction company to build a school after the two parties had failed to agree upon a collective agreement in compliance with Swedish regulations. An emotional public debate followed that resulted in a discussion of the proposal for the Services Directive of the EU, based upon the country-of-origin principle. In this thesis we will analyze whether the country-of-origin principle or the country-of-destination principle is best suited to capture the gains-of-trade that the common market hoards and improve welfare within the EU. We conclude that the country-of-origin principle is the more apt of the two, though it leads to some short-run costs such as structural unemployment. But these will be more than outweighed by the gains in aggregate welfare for the EU in the long run..

Viktiga aspekter i samverkansformen NCC Projektstudio : En intervjustudie för NCC

The projecting time in the construction industry needs to become more efficient toshorten the amount of time it takes to project a build. One of the North's leadingconstruction company NCC constuction Sweden AB has developed a form ofcollaboration called ?NCC project studio? that they use in some projects today.My thesis consists in bringing forth the most important aspects of the collaborationform called NCC project studio. The point of this is to use my thesis to help thecompany develop a quality document that can assist them when starting collaborationbased on NCC project studio in the future.The conclusion of my thesis was that much of the focus needs to be on explaining tothe participants what NCC is aiming to gain from working with the NCC projectstudio and also which important parts that needs to be worked on..

1 Nästa sida ->